Is it possible to transfer or convert the data from the existing system to the Tactive system?

Yes. Data transfer from the old system to the new system is possible in the Tactive construction management system.

WASTAGE CONTROL

Optimum Purchase and Stock Management
Click Here
ALWAYS STAY ON SCHEDULE

Realistic Planning and Scheduling with Tactive
Click Here
Previous
Next
Related Post

Download detailed module datasheets